Chapter 4, Commissioning The Installation; Commissioning - Workflow; Step 1, Activating The System - SolarEdge SE3000 Installation Manual

Hide thumbs Also See for SE3000:
Table of Contents

Advertisement

Chapter 4
Commissioning the Installation
Commissioning – Workflow
The following workflow describes how to activate the system, commission the
installation and verify the proper functioning of the system.
Step 1, Activating the System, page 33
Step 2, Pairing Power Optimizers to the Inverter, page 35
Step 3, Verifying Proper Operation, page 37
Step 4, Reporting and Monitoring Installation Data, page 38
NOTE:
Keep this manual accessible and preferably near the inverter.

Step 1, Activating the System

This section describes how to perform the initial activation stages of the
SolarEdge system.
These stages are preformed after the inverter and power optimizers have been
installed and the power optimizers have been connected to the inverter.
To activate the SolarEdge installation:
1
Power OFF the inverter by turning off the ON/OFF switch at the bottom of
the inverter and the DC switch (if exists).
2
Turn on the AC to the inverter. The following message appears on the
inverter's LCD panel:
V a c [ v ]
2 3 0 . 7
P _ O K :
SolarEdge Installation Guide – MAN-01-00057-2.0
V D c [ v ]
1 4 . 1
0 0 0 / 0 0 0
Commissioning the Installation
P a c [ w ]
0 . 0
< S _ O K >
O F F