Setting Backup-Only

To access the Energy Ctrl menu:
 1.  Enter Setup mode, scroll down to the Power Control menu and select it. A menu similar to the 
following is displayed:
G r i d
E n e r g y
R R C R
R e a c t i v e
A c t i v e
P h a s e
W a k e u p
P ( f )
A d v a n c e d
L o a d
 2.  Select Energy Manager. The following screen is displayed:
L i m i t
E n e r g y
S t o r a g e
A d v a n c e d
Limit Control: For power limitation (including export limitation) configuration. This option can be 
used in parallel to energy control. For more information refer to 
http://www.solaredge.us/files/pdfs/products/export_limitation_application_note_NA.pdf. 
 
E: Export limit
o
 
P: Production limit 
o
 
Dis: Disabled - no limit 
o
Energy Control: The method by which to manage the energy. 
Storage Control: Enables reserving a minimum battery charge level.
 3.  Select Energy Ctrl.. The following is displayed, showing the SolarEdge applications:
M a x
S e l f - c o n s u m e
T i m e
B a c k u p
D i s a b l e
Max Self-consume (MSC): Maximize Self-consumption 
Time of Use (TOU): Charge/Discharge Profile Programming
Backup Only: Supply power to loads during power outage
Disable: No energy control, that is, the battery is not used
Setting Backup-Only
When the inverter is set to Backup-only mode, the battery will discharge to supply power to the backed-
up loads only upon power outage.
To set up Backup-only:
 1.  Access the Energy Ctrl menu as described above.
82
C o n t r o l
< E n >
M a n a g e r
C o n f .
P w r
C o n f .
P w r
C o n f .
B a l a n c e
< D i s >
C o n f .
D e f a u l t s
C o n t r o l < D i s >
C t r l
< D i s >
C t r l
o f
U s e
O n l y
SolarEdge StorEdge Installation Guide MAN-01-000262-1.2