 10.  Terminate the first and last SolarEdge device (inverter/Control and communication gateway, etc.) in 
the chain by switching a termination DIP-switch inside the inverter to ON (move the switch up). The 
switch is located on the communication board and is marked SW7. 
NOTE
Only the first and last SolarEdge devices in the chain should be terminated. The other inverters in
the chain should have the termination switch OFF (down position).

Verifying the Connection

After connecting and configuring a communication option, perform the following steps to check that 
the connection to the monitoring server has been successfully established.
 1.  Close the inverter cover: Attach the inverter cover and secure it by tightening the screws with a 
torque of 9.0 N*m/ 6.6 lb.*ft. For proper sealing, first tighten the corner screws and then the two 
central screws. 
 2.  Turn ON the AC to the inverter by turning ON the circuit breaker on the main distribution panel and 
turning on the StorEdge Connection Unit.
 3.  Wait for the inverter to connect to the SolarEdge monitoring platform. This may take up to two 
minutes.
A status screen similar to the following appears on the LCD panel:
V a c [ V ]
2 4 0 . 7
P _ O K :
- - - - - - - - - - - - - - -
S_OK: Indicates that the connection to the SolarEdge monitoring platform is successful. If S_OK is not 
displayed, refer to "Troubleshooting" on page 87.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.2
Chapter 8: Setting Up Communication to the Monitoring Platform
Figure 40: RS485 termination switch
V d c [ V ]
P a c [ w ]
1 4 . 1
0 . 0
0 0 0 / 0 0 0
< S _ O K >
O F F
77