Communication Ports Status
Communication Ports Status
R S 4 8 5 - 1 < S E > < S
Z i g B e e
##: The total number of slaves detected on the specific port
l
Dev: The type of device that was configured to a specific port (based on the port's functionality), as
l
follows:
SE: SolarEdge device (default)
o
LGR: Non-SolarEdge logger
o
MLT: Multiple devices, such as meters and batteries
o
HA: Home automation devices (for load management)
o
PROT: The protocol type to which the port is set:
l
For a SolarEdge device:
o
RS485 protocol
For electricity meters, r efer to the application note - Connecting an Electricity Meter
o
to SolarEdge Devices at http://www.solaredge.com/files/pdfs/solaredge-meter-
installation-guide-na.pdf.
SS: SunSpec - for a non-SolarEdge logger (monitoring and control)
o
Smart Energy Management Status
This screen is displayed only when Smart Energy Management is enabled. The screen shows energy details
of the site:
S i t e
L i m i t :
S i t e
P r o d :
S i t e
E x p o r t :
S e l f - c o n s u m e :
Site Limit: The limit that was defined for the site
l
Site Prod: The power produced by the site
l
Site Export: The power that is fed into the grid
l
Self-consume: The PV power consumed by the site
l
For more information, refer to the Export Limitation Application Note, available on the
SolarEdge website at http://www.solaredge.us/files/pdfs/products/feed-in_limitation_
application_note.pdf.
66
D e v
P r o t
# #
>
< - - >
< S E > < M P S > < - - >
S: SolarEdge slave
M: SolarEdge master
7 . 0 k W
1 0 . 0 k W
4 . 0 k W
6 . 0 k W
SolarEdge StorEdge Installation Guide MAN-01-000262-1.2
ZigBee protocol
P2P: ZigBee point-to-point
MPM: ZigBee multipoint master (for the SolarEdge ZigBee
home gateway or for load management by the inverter)
MPS: ZigBee multipoint slave (for a ZigBee router card)