Step 1: Activating the System
 5. Verify that the inverter is configured to the proper country: Press the LCD light button until reaching 
the ID status screen: 
D S P 1 / 2 : 1 . 0 2 1 0 / 1 . 0 0 3 4
C P U : 0 0 0 3 . 1 9 x x
C o u n t r y : U S A 1
 6. If required, perform the following additional steps before closing the inverter cover:
Country settings or inverter configuration using the internal LCD user buttons – refer to 
l
Country and Grid on page 58.
Communication options connection – refer to Setting Up Communication to the Monitoring 
l
Platform on page 69.
StorEdge application configuration - refer to System Configuration on page 78.
l
 7. Close the inverter cover   b y tightening the screws with a torque of 9.0 N*m/ 6.6 lb*ft. For proper
sealing, first tighten the corner screws and then the two central screws. The following figure 
illustrates recommended order:
 8. Close the StorEdge Connection Unit internal cover: Attach the cover and secure it by tightening the 
four screws with a torque of 1.2 N*m / 0.9 ft.*lb.
 9. Make sure the AC Bypass switch in the StorEdge Connection Unit is switched to the left (position 1).
 10. Make sure the backed-up loads AC breaker   i n the StorEdge Connection Unit is UP.
46
Figure 28: Tightening order of the screws
Figure 29: StorEdge Connection Unit
SolarEdge StorEdge Installation Guide MAN-01-000262-1.2