FORM 150.72-EG6 (516)
Guide Specifications (Cont'd)
PART 3 – EXECUTION
3.01 INSTALLATION
A. General: rig and install in full accordance with manufacturer's requirements, project
drawings, and contract documents.
B. Location: locate chiller as indicated on drawings, including cleaning and service main-
tenance clearance per manufacturer instructions. Adjust and level chiller on support
structure.
C. Components: installing contractor shall provide and install all auxiliary devices and ac-
cessories for fully operational chiller.
D. Electrical: co-ordinate electrical requirements and connections for all power feeds with
electrical contractor (Division 16).
E. Controls: co-ordinate all control requirements and connections with controls contractor.
F. Finish: installing contractor shall paint damaged and abraded factory finish with touch-
up paint matching factory finish.