SECTION 9.13
SUPPLEMENTS-WIPAIRE 2100S
SEAPLANE FLOATS
9.13.4.4.2
Right Fuselage ................................................. Check
Baggage Door .................................................. Closed
Accessory Door ............................. Closed and latched
Tank Sump .......................................................... Drain
Flap Surface ....................................... Check condition
Flap Hinges ....................................................... Check
Aileron Surface ................................... Check condition
Aileron Hinges ................................................... Check
Wing Tip and Light ............................................ Check
Stall Warning Vane ............................ Check condition
Vortex Generators ............................................. Check
Tie Down ........................................................ Remove
Fuel Vent ........................................................... Check
Fuel Tank ............... Check supply and cap for security
Water Rudders and Cables ............................... Check
Float ........ Check for damage and water accumulation
Remove rubber plugs which serve as stoppers on the
standpipe in each float compartment and pump out any
accumulation of water. Reinstall rubber plugs with
Bilge rubber plugs ............................................ Secure
Oar ..................................... Check stowed and secure
Float hatches ......... Cargo secure and hatches latched
REPORT TC10000AFM
Page Number: 9-13-12
Preflight Right Fuselage, Wing, and Float
enough pressure for a snug fit.
CUB CRAFTERS
(use bilge pump as necessary)
NOTE
Date of Revision: 09/15/15
CC18-180
Issued: 10/09/12