Sign In
Upload
Manuals
Brands
Fimer Manuals
Inverter
REACT2-BATT(-5.0)
Fimer REACT2-BATT(-5.0) Manuals
Manuals and User Guides for Fimer REACT2-BATT(-5.0). We have
1
Fimer REACT2-BATT(-5.0) manual available for free PDF download: Product Manual
Fimer REACT2-BATT(-5.0) Product Manual (168 pages)
Brand:
Fimer
| Category:
Inverter
| Size: 31 MB
Table of Contents
Introduction and General Information
4
Warranty and Supply Conditions
4
Not Included in the Supply
4
Table of Contents
5
Table of Content
5
Reference Number Index
9
Graphical Representation of References
10
REACT2-UNO-3.6/5.0-TL (External View)
10
REACT2-BATT(-5.0) (External View)
10
REACT2-UNO-3.6/5.0-TL (Internal View)
11
Single Phase Energy Meter
12
React-Mtr-1Ph
12
Eastron Sdm230-V2
12
Abb B21 1Ph
13
Three Phase Energy Meter
14
Eastron Sdm630 V2
14
Abb B23, B24 3Ph
14
Scope and Target Audience
15
Purpose and Document Structure
15
List of Appendix Documents
15
Operator and Maintenance Personnel Skills/Prerequisites
15
Symbols and Signs
16
Field of Use, General Conditions
18
Intended or Allowed Use
18
Limits in Field of Use
18
Improper or Disallowed Use
19
Characteristics
20
General Conditions
20
Models and Range of Equipment
21
Identification of the Equipment and Manufacturer
22
Communication Identification Label
23
Characteristics and Technical Data
24
Tightening Torques
27
Overall Dimensions REACT2-3.6/5.0-TL-OUTD
28
Overall Dimensions REACT-MTR-1PH
29
Overall Dimensions Meter ABB B21
29
Overall Dimensions Meter EASTRON SDM230-V2
29
Overall Dimensions Meter EASTRON SDM630-V2
30
Overall Dimensions Meter ABB B23, B24
30
Dimensions Bracket REACT2-UNO-3.6/5.0-TL
31
Dimensions Bracket REACT2-BATT(-5.0)
32
Efficiency Curves
33
Power Limitation (Power Derating)
34
Power Reduction Due to Environmental Conditions
34
Power Reduction Due to the Altitude of the Installation
35
Output Power Reduction Due to the Input Voltage
36
Input Power Reduction Due to the Input Voltage
37
P- Q Curve Capability
38
Characteristics of a Photovoltaic Generator
39
Strings and Arrays
39
Description of the REACT2 System
40
Notes on the Sizing of the System
40
Operating Diagram
41
Connectivity Diagram
42
Operating Stages of the System
43
Functionality and Components of the Equipment
44
Topographic Diagram of the Equipment
46
Safety Devices
47
Anti-Islanding
47
Ground Fault of the Photovoltaic Panels
47
REACT2-BATT(-5.0) State of Health (SOH)
47
Other Safeguards
47
Safety and Accident Prevention
48
Safety Information and Instructions
48
Hazardous Areas and Operations
49
Environmental Conditions and Risks
49
Signs and Labels
49
Thermal and Electrical Hazard
50
Clothing and Protection of Personnel
50
Safety Precautions Relating to REACT2-BATT(-5.0)
51
Residual Risks
53
Table of Residual Risks
53
Lifting and Transport
54
General Conditions
54
Storage of Equipment
55
Special Rules for Storage of REACT2-BATT(-5.0)
55
Lifting
56
Equipment Weight
56
Transport of the Equipment
57
Road Transport of Battery Unit
57
Unpacking and Checking
58
General Handling Information
58
List of Components Supplied
58
Installation
60
General Conditions
60
Environmental Checks
61
Wireless Signal Environmental Checks
63
Installations above 2000 Metres
64
Installations with a High Level of Humidity
64
Mounting Instruction - REACT2 System
65
Mounting Instruction - REACT2 Multi Battery System
69
Connection of the Energy Meter
71
Connection of the EASTRON SDM230-V2 Meter (Single-Phase)
75
Connection and Configuration of the FIMER B21 Meter (Single-Phase)
77
Connection and Configuration of the EASTRON SDM630-V2 Meter (Three-Phase)
79
Connection and Configuration of the REACT-MTR-3PH (Three-Phase)
81
Distribution Grid Output Connection (AC Side)
83
Characteristics and Sizing of the Line Cable
83
Load Protection Switch (AC Disconnect Switch)
84
Installation of the Cable on the AC Output Connector
84
Connection for the AC Output Connector to the Inverter
86
Installation of the External Protective Grounding Cable
87
BACKUP Output Connection (AC)
88
Characteristics and Sizing of the Cable for BACKUP Output
89
Load Protection Switch (AC Disconnect Switch) for BACKUP Output
89
Connection to AC BACKUP Output Terminal Block
89
Preliminary Operations for Connection of the PV Generator
90
Checking the Correct Polarity of the Strings
90
Checking of Leakage to Ground of the Photovoltaic Generator
90
Selection of Differential Protection Downstream of the Inverter
90
Configuration of Independent or Parallel Input Channels
92
Channel Configuration Examples
93
Independent Channel Configuration (Default Configuration)
94
Configuration of Parallel-Connected Channels
94
Input Connection to PV Generator (DC Side)
95
Installation Procedure for Quick-Fit Connectors
96
Communication and Control Signal Connections
100
External Backup Command Connection
101
Remote Control Connection
101
+5V Output Connection
102
Connection of RS485 LOGGER Serial Communication Line
102
Ethernet Connection
104
Configurable Relay Connection (OUTPUT 1 and OUTPUT 2)
106
Instruments
107
General Conditions
107
User Interface
108
Description of the Synoptic
108
Embedded Web User Interface
108
Aurora Vision Plant Management Platform
108
FIMER Ability™ Energy Viewer for Solar Plants
109
Measurement Tolerance
109
Operation
110
General Conditions
110
Commissioning
111
React2 & Flexa Integration
118
Free@Home Protocol Activation
121
Synoptic Icons Behaviour
122
Red GFI LED
123
Description of the Web User Interface
124
Access to the Web User Interface
124
Web User Interface Menu Structure
127
MAIN Section
128
SETTING Section
129
Inverter Log
135
USER Section
136
Connectivity
137
Service TOOLS
139
Information
142
Inverter Switch-Off
143
Operator and Maintenance Personnel Skills/Prerequisites
143
Switch-Off Procedure
144
Maintenance
146
General Conditions
146
Routine Maintenance
147
Troubleshooting
147
Alarm Messages
148
Power Limitation Messages
156
Procedure for Dismantling of the REACT2 System
158
Registration on Website and Calculation of Admin Plus Password
159
Verification of Ground Leakage
162
Behaviour of a System Without Leakage
162
Behaviour of a System with Leakage
163
Measuring the Insulation Resistance of Photovoltaic Generator
164
Storage and Dismantling
165
Storage of the Equipment or Prolonged Stop
165
Dismantling, Decommissioning and Disposal
165
Attachments
166
Port and Network Services Used by the Inverter
166
IP Network Services
166
Network Hosts
167
Inverter Network Configuration
167
Contact Us
168
Advertisement
Advertisement
Related Products
Fimer REACT2-BATT
Fimer REACT 2
Fimer REACT2-UNO-3.6-TL
Fimer REACT2-UNO-5.0-TL
Fimer REACT2-UNO-3.6/5.0-TL
Fimer Series R25-R55
Fimer R25 Series
Fimer R55 Series
Fimer R50 Series
Fimer R35 Series
Fimer Categories
Inverter
Welding System
Battery Charger
Automobile Battery Charger
Industrial Equipment
More Fimer Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL