Sign In
Upload
Manuals
Brands
Azbil Manuals
Controller
AUR890G230
Azbil AUR890G230 Manuals
Manuals and User Guides for Azbil AUR890G230. We have
1
Azbil AUR890G230 manual available for free PDF download: User Manual
Azbil AUR890G230 User Manual (62 pages)
Burner Controller
Brand:
Azbil
| Category:
Controller
| Size: 3 MB
Table of Contents
Table of Contents
6
Chapter 1. Overview
9
Features
9
System Configuration
9
Ensuring Safety
9
Instructions for Proper Use
10
Precautions on Facility Design
10
Most Important Points for Ensuring Safety
10
Precautions for Instrumentation
10
Model Number
11
Related Equipment
11
Compatible Flame Detector (Sold Separately)
11
Optional Parts (Sold Separately)
11
Chapter 2. Installation, Wiring
12
Installation, Precautions for Wiring
12
Installation Method
13
Cautions Regarding Installation
14
When the Sub-Base (BC-R05A100) Is Used
15
Installation Orientation
15
DIN Rail Mounting
15
Mounting in a Panel
15
Mounting/Removing the Device and Sub-Base (Sold Separately)
16
When the Base Unit (Q890A100) for RA890 Replacement Is Used
17
Installation Orientation
17
Mounting in a Panel
17
Terminal Numbers, Front Panel Item Names
19
Terminal no
19
Connector for Front Wiring (81447514-001) Terminal Layout
20
Connector for Front Wiring (for Right Side Wiring) (81447514-002) Terminal Layout
20
External Connection Terminals of the RA890 Replacement Base Unit (Q890A100)
21
Example of Wiring Connection with External Device
22
When the BC-R05A100 Sub-Base Is Used (Terminals 1-24 Are on Sub-Base, 25-35 on Front Connector)
22
Q890A100 Base Unit for RA890-AUR890 Replacement
24
Wiring to a Flame Detector (UV Sensor)
26
Wiring to a Rectification Flame Rod
26
Example Countermeasures against Power Surges Caused by Lightning
27
Connections to Solenoid Valve
28
Chapter 3 . Operation
29
Part Names
29
Operation
29
Reset Switch
29
DISP Switch
29
Example of Wiring Connection with External Device: Internal Block Diagram
31
On Front Connector)
31
Chapter 4. Explanation of Operation
32
Q890A100 Base Unit for RA890-AUR890 Replacement
33
Example Sequence
35
Normal Operation (Non-Recycling Gas-Fired Combustion)
35
Operation When an Ignition Failure Occurs (Non-Recycling Gas-Fired Combustion)
36
Operation When a Flame Failure Occurs (Non-Recycling Gas-Fired Combustion)
37
Operation When There Is a False Flame before Start Input (Non-Recycling Gas-Fired Combustion)
38
Normal Operation (Non-Recycling Oil-Fired Combustion (2-Level Combustion))
39
Operation When an Ignition Failure Occurs (Non-Recycling Oil-Fired Combustion (2-Level Combustion))
40
Operation When a Flame Failure Occurs (Non-Recycling Oil-Fired Combustion (2-Level Combustion))
41
Operation When There Is a False Flame before Start Input (Non-Recycling Oil-Fired Combustion (2-Level Combustion))
42
Chapter 5. Trial Operation and Adjustment
43
Preliminary Inspection
43
Inspection Procedure
43
Ignition Spark Response (UV Sensor)
44
Measurement of Flame Voltage
45
Measurement Method for Flame Voltage
46
Checking Ignition Time in a Case Where It Is Configured with an External Timer
46
Pilot Turn-Down Test
47
Safety Shutoff Check
48
Chapter 6. Maintenance and Inspection
49
General Maintenance and Inspection
49
Maintenance and Inspection Cycle
49
Alarm Codes and Details
50
Failure Inspection Flow
51
Advertisement
Advertisement
Related Products
Azbil AUR890 Series
Azbil AUR890F Series
Azbil AUR890G Series
Azbil AUR890F110
Azbil AUR890F130
Azbil AUR890F210
Azbil AUR890F230
Azbil AUR890G130
Azbil AUR450C
Azbil AUR455
Azbil Categories
Controller
Control Unit
Measuring Instruments
Security Sensors
Transmitter
More Azbil Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL