2.1 Indoor unit
2.1
RAV-162BH-PE
2.1
RAV-262BH-PE
2.1
RAV-362BH-PE
2.1
RAV-462BH-PE
Unit dimension: A
H a n g i n g b o l t p i t c h : B
Ceiling opening: D
P a n e l o u t e r d i m e n s i o n : E
Model
A
RAV-162BH-PE
700 750 12.7 6.4 252 280 280
RAV-262BH-PE 10001050 15.9 9.5 252 580 290
RAV-362/462BH-P 13501400 19.0 9.5 252 930 310
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
2. CONSTRUCTION VIEWS
Air oulet
H a n g i n g b o l t
Provided at site
R e f r i g e r a n t p i p e
connection port
( L a r g e r s i d e ø F )
R e f r i g e r a n t p i p e
connection port
(Smaller side øG)
D r a i n p i p e c o n n e c t i o n p o r t
(Inner diameter: 32)
( P o r t d i a m e t e r : 2 5 n o m i n a l ,
f o r P V C p i p e s )
Wiring connection port
B
F
G
H
J
-15-
www.heronhill.co.uk
Thermal insulator height 11mm
around supply air port
U n i t d i m e n s i o n : 8 0 0
Hanging bolt pitch: 565
Ceiling opening: 470
P a n e l o u t e r d i m e n s i o n : 5 0 0
Ensure that there is sufficient space around the
indoor units for installation and servicing.
(Unit: mm)
K
M
N
1
2
2
3
3
4
6 - ø 4 M o u n t i n g s c r e w h o l e ø 1 6 0
ø 1 2 5 K n o c k o u t
hole (rear)
(Fresh air inlet)
Long-life filter kit
(Option)
Suction canvas
(Option)
Ceiling panel
(Option)
[Indoor unit]
Inspection hole
Provide an inspection
hole around here.
Fax: 01823 665807
Need help?
Do you have a question about the RAV-162BH-PE and is the answer not in the manual?