3. Align both side of the bottom of the rail with the 1U delimiting marks on the front pole of the rack and
let the two projections on the rail into the holes on the pole.
There are two types of rack, rectangular-hole rack and circular-hole rack. Each of them has a
different type of projection on the rail.
Insert M5 screws into the two central screw holes on the front pole of the rack to screw the rail.
4. Move the inner towards the rear pole of the rack and let the two projections in the holes on the pole.
Release 6.0

Figure 3-5: Screwing Rail on Front Pole

Figure 3-6: Attaching Rail to Rear Pole