GE CP350 Installation Instructions Manual page 4

30" electric cooktop
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
PREPARING THE OPENING
(Cont)
CUTOUT DIMENSIONS
OF THE COUNTERTOP
To insure accuracy,
it is best to make a template
when cutting
the opening
in the counter.
th of cut
i-3/4"
Min. Between
_
cut
i-_
"
_
I
cutout and the wall
_/
_
I
2-1/2"
Min. from front
edge
I II
of cutout and front edge of
countertop
JXTR32X CUTOUT FILLER TRIM KIT:
A filler trim kit is available for use if your countertop
cutout is larger than the dimensions
shown, up to
29-13/16"
x 20-7/16". Order JXTR32X to reduce the
cutout opening for installation
of this cooktop. This
kit may be ordered from your GE Dealer.
r_
Hake sure the wall coverings, countertop
and
cabinets around the cooktop can withstand
heat (up to 200°F) generated
by cooktop.
countertop
must
withstand heat up
to 200°F.
/
/
E_
For Americans
with Disabilities Act (ADA)
Forward Approach
Installation
Only:
For models with
no drop box,
allow 5" minimum
depth between the
countertop
and an
enclosure.
For models with
a drop box, allow
6-1/2" minimum
depth between the
countertop
and an
enclosure.
(PP945)
Drop /
I1_
box
_=1
NOTE: The enclosure
must be made of wood
material. Also, an access panel is required for the
junction
box, hold-down
brackets, and service.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jp356Jp336Jp340Pp912Pp932Pp942 ... Show all

Table of Contents