Battery Installation and Removal
1.Please follow below drawing, step by step to install battery.
Step 1: Push down button, same time, pull out dust-bin.
Step 2: Let QQ6 flip over. Follow the Arrow direction of battery, and
take battery into slot.
Step 3: Let plastic hook lock battery ready.
Step 4: Put back dust-bin into QQ6.
Step 1
Push down "Button", same
time Pull out "Dust-bin"
Step 3
2.Please follow below drawing, step by step to remove battery.
Step 1: Pull 2 hooks in the same time, battery will be popup itself.
Step 2: Take out battery.
Step 1
Step 2
Step 4
Step 2
8
Purpose:
If lost or buy new one of charging base, sonic wall,
You need setting ID into new unit for communication with
How to set up ID:
Status of main unit indicator lamps when
studying
Charging station 1 Chargi ng station2 Sonic wall 1 Sonic wall 2
Light up ------- Means the
ID has been used already
Light off ------ Means the ID has not been used yet
Tip: Each one main unit at most can be equipped with two
charging stations and 2 sonic walls at the same time.
Step:
a) Let the main unit into study mode:
Push the start button
on the main unit,
until heard 'DI-DI' sounds, and the display panel show 【Cd 】 ,
the time,
it means the main unit into study mode already.
b) Let the charging station start to study:
There are two
and
display symbols to locate two charging station.
Any one of
symbols
does not light up, you can follow the steps to set up ID.
Step 1: Power on the charging station.
Step 2: Press the time setting button
sounds, and one of the two buttons symbol will light up (the symbol must
light off before) ,it means the charging station complete the study.
Setting ID with Main unit
QQ6
.
Then press the uv button
all the time, until heard DI - DI ''
17
all
Need help?
Do you have a question about the Cleanmate QQ6 Series and is the answer not in the manual?