Drive Pulley, Drive Belt And Driven Pulley Installation - KYMCO DINK 125 Service Manual

Hide thumbs Also See for DINK 125:
Table of Contents

Advertisement

8
. DRIVE AND DRIVEN PULLEYS/
KICK STARTER
INSTALLATION
Apply lubricant to the drive face boss inner
surface, then install the movable drive face
assembly.
Install the clutch outer onto the driven pulley
assembly.
Compress the driven pulley assembly by hand,
then install the drive belt into the driven
pulley assembly.
● The drive belt should be installed so
that the arrows on the drive belt
periphery point in the normal turning
direction if the drive belt has arrow
mark.
● The drive belt contact surface of the
driven face should be thoroughly
cleaned.
Install the driven pulley assembly/clutch
outer and drive belt together.
Use the special tool to hold clutch outer, then
tighten the nut to the specified torque.
Torque: 5.5 kgf-m (55 N-m, 40 lbf-ft)
Special tool:
Universal holder
A120E00017
Boss
Movable Drive Face Assembly
Clutch Outer/Driven Pulley Assembly
Drive Belt
A120E00056
Nut
DINK 50/125
Universal Holder
8-12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dink 50

Table of Contents