Installation Diagrams Standard Ceiling With A Factory Built Chimney; Cathedral Ceiling With A Factory Built Chimney - Lopi Answer Wood Stove Owner's Manual

Lopi answer wood stove owner's manual
Table of Contents

Advertisement

Stove Installation
14
Standard
Ceiling with
a Factory
B u i l t
Chimney
Cathedral
Ceiling with
a Factory
B u i l t
Chimney
Travis Industries
Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)
Chimney Sections
Insulation
Follow the chimney
manufacturer's instructions
and clearances for floor
penetrations. A ceiling
support is required, an attic
insulation shield is required
where insulation is present.
Chimney Connector Sections
Floor Protection
(See the section "Floor
Protection Requirements"
for more details)
Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)
Chimney Sections
Minimum Air Space to
Combustibles (See Chimney
Manufacturer's Instructions -
usually 2")
Chimney
Connector
Sections
Floor Protection
(See the section "Floor
Protection Requirements"
for more details)
(for qualified installers only)
}
}
}
93508131
Follow the chimney
manufacturer's instructions
and clearances for roof
penetrations. A storm collar
and flashing are required
(some require a radiation
shield).
Minimum Air Space to
Combustibles (See
Chimney Manufacturer's
Instructions - usually 2")
Minimum 15'
Maximum 33'
Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)
Follow the chimney
manufacturer's instructions
and clearances for roof
penetrations. A storm
collar, flashing, and
cathedral-style chimney
support are required
(some require a radiation
shield).
Minimum 15'
Maximum 33'
Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)
4 020327

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Answer

Table of Contents