Checklist - Carrier 59TP6A Installation, Start-Up, Operating And Service And Maintenance Instructions

Two---stage variable speed ecm multipoise condensing gas furnace series 1
Hide thumbs Also See for 59TP6A:
Table of Contents

Advertisement

Checklist

1. Put away tools and instruments. Clean up debris.
2. Verify that switches SW1- -1 and SW1- -6 are OFF and other
setup switches are set as desired. Verify that switches
SW1- -7 and SW1- -8 for the blower OFF DELAY are set as
desired per Table 19.
3. Verify that blower and control doors are properly installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer's instruc-
tions.
6. Review Owner's Manual with owner.
7. Attach literature packet to furnace.
TWO-STAGE
ON/OFF Switch
1/2" NPT Inlet
1/8" NPT Inlet
Pressure Tap
Fig. 54 - - Gas Valve
Regulator Seal Cap
Regulator Adjustment
Regulator Seal Cap under Cap
1/2" NPT Outlet
1/8" NPT Manifold
Pressure Tap
A11152
70
Fig. 55 - - Orifice Hole
THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED
(ANITICIPATOR, CLOCK, ETC.,
MUST BE OUT OF CIRCUIT.)
HOOK-AROUND
AMMETER
R Y W G
10 TURNS
FROM UNIT 24-V
CONTROL TERMINALS
0.5 AMPS FOR THERMOSTAT
EXAMPLE: 5.0 AMPS ON AMMETER
=
ANTICIPATOR SETTING
10 TURNS AROUND JAWS
Fig. 56 - - Amp. Draw Check with Ammeter
BURNER
ORIFICE
A93059
A96316