Carrier 59TP6A Installation, Start-Up, Operating And Service And Maintenance Instructions page 27

Two---stage variable speed ecm multipoise condensing gas furnace series 1
Hide thumbs Also See for 59TP6A:
Table of Contents

Advertisement

PERFORATED
DISCHARGE DUCT
FLANGE
5/ 16
(8mm)
(8mm)
5/ 16
1
3
/
4
(44mm)
1
(44mm)
(8mm)
5
/
16
(8mm)
5/ 16
(44mm)
1
3/ 4
1
3/ 4
(44mm)
Fig. 21 - - Leveling Legs
LEVEL 0-IN. (0 MM) TO
1/2-IN. (13 MM) MAX
UPFLOW
90°
YES
YES
120°
MIN
NO
Fig. 20 - - Duct Flanges
3
/
4
A89014
MIN 1/4-IN. (6 MM) TO
1/2-IN. (13 MM) MAX
UPFLOW OR
DOWNFLOW
Fig. 23 - - Furnace Pitch Requirements
DOWNFLOW
YES
YES
120°
MIN
NO
BOTTOM PLATE
Fig. 22 - - Removing Bottom Closure Panel
HORIZONTAL
27
HORIZONTAL
90°
YES
YES
120°
MIN
NO
A10493
BOTTOM
CLOSURE
PANEL
A11092
A11237

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

59tn6a

Table of Contents