Periodic Maintenance Procedures
Air Suction System Damage Inspection
•
Remove:
Fuel Tank (see Fuel Tank Removal in the Fuel System
(DFI) chapter)
Air Cleaner Housing (see Air Cleaner Housing Removal
in the Fuel System (DFI) chapter)
•
Take the air switching valve hose end [A] outside of the
frame [B].
•
Reinstall the air cleaner housing [A] (see Air Cleaner
Housing Installation in the Fuel System (DFI) chapter).
•
Connect the fuel pump lead connector [B].
•
Using the extension tube [C], connect the fuel tank [D] to
the throttle body.
Special Tool - Extension Tube: 57001-1578
•
Start the engine and run it at idle speed.
•
Plug the air switching valve hose end [E] with your finger
and feel vacuum pulsing in the hose.
If there is no vacuum pulsation, check the hose line for
leak. If there is no leak, check the air switching valve
(see Air Switching Valve Unit Test in the Electrical Sys-
tem chapter) or air suction valve (see Air Suction Valve
Inspection in the Engine Top End chapter).
•
Remove:
Extension Tube
Fuel Pump Lead Connector (Disconnect)
•
Remove the air cleaner housing (see Air Cleaner Housing
Removal in the Fuel System (DFI) chapter).
•
Apply a soap and water solution or rubber lubricant to the
end of the air switching valve hose [A] and install the hose
on the fitting.
•
Install:
Air Cleaner Housing (see Air Cleaner Housing Installa-
tion in the Fuel System (DFI) chapter)
Fuel Tank (see Fuel Tank Installation in the Fuel System
(DFI) chapter).
Clutch
Clutch Operation Inspection
•
Pull the clutch lever just enough to take up the free play
[A].
•
Measure the gap between the lever and the lever holder.
Clutch Lever Free Play
2 ∼ 3 mm (0.08 ∼ 0.12 in.)
Standard:
If the gap is too wide, the clutch may not release fully. If
the gap is too narrow, the clutch may not engage fully. In
either case, adjust it.
PERIODIC MAINTENANCE 2-25
Comments to this Manuals
Latest comments:
I’ve a ER6N 2006, which has run 30.000 km.
Any one who can tell me interval to exchange the oil, check/adjust ventils - and/or if regular service is required?
Thanks a lot for your help/information/advise.
Best regards
Hanne
line 30 qty 7
SEAL,BULK NOUN:
PARENT EQUIPMENT/FUNCTION:
MECHANICAL,COMPONENT,BALANCED,O-RING SEC SEAL;
SIZE:35.5 MM HSNG BORE,37 MM SHFT/SLV DIA;
MATERIAL:CARBON ROT FACE,STL STA FACE,
RUBBER GAS KET,STL HARDWARE,STL SPRING;
ADDITIONAL DATA:
FOR KAWASAKI ELECTRO HYDRAULIC POLISHING PUMP
DWG NO: Y307179-1
TYPE 45-4LXA05993,.
KAWASAKI HEAVY INDUSTRIES LTD.:
DWG#510/SEAL