Lincoln Electric SVM154-A Service Manual page 87

Ln-10 heads & controls boom mount or bench models
Table of Contents

Advertisement

F-42
CURRENT SENSING REED SWITCH REMOVAL AND REPLACEMENT (CONTINUED)
FIGURE F.11 — CURRENT SENSING REED SWITCH /PLUG LOCATION.
Reed Switch
Cover
PROCEDURE
1. Remove input power to the LN-10 unit.
2. Remove the reed switch plug from the front of the
machine. See Figure F.11.
3. Remove the Reed Switch Cover. See Figure F.11.
4. Using a 3/4" socket, remove the two nuts from the
copper energizer. Remove Reed Switch and cop-
per energizer assembly. Using a slot head screw-
TROUBLESHOOTING AND REPAIR
Current Sensing
Reed Switch
Locking Screw
driver, loosen the locking screw and remove the
reed switch from the energizer. Note lead routing for
reassembly. See Figure F.11.
5. Replace Reed Switch into the copper energizer and
tighten locking screw. Mount the assembly to the
machine using 3/4" nuts.
6. Plug in Reed Switch lead to front of machine.
7. Slide Reed Switch cover back on the LN-10.
LN-10
F-42
Plug

Advertisement

Table of Contents
loading

Table of Contents