Voltronic Power 10KW User Manual

Voltronic Power 10KW User Manual

Hybrid 10kw pv inverter

Advertisement

User Manual
Hybrid 10KW PV Inverter
Version: 1.2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 10KW and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Voltronic Power 10KW

  • Page 1 User Manual Hybrid 10KW PV Inverter Version: 1.2...
  • Page 2: Table Of Contents

    Table Of Contents Introduction ..................1 Important Safety Warning..............2 Unpacking & Overview ................4 3-1. Packing List ................... 4 3-2. Product Overview ................4 Installation ................... 5 4-1. Selecting Mounting Location............5 4-2. Mounting Unit ................5 Grid (Utility) Connection ................ 7 5-1.
  • Page 3: Introduction

    1. Introduction This hybrid PV inverter can provide power to connected loads by utilizing PV power, utility power and battery power. Hybrid inverter Distribution Box PV module Electric grids Load Battery Figure 1 Basic hybrid PV System Overview Depending on different power situations, this hybrid inverter is designed to generate continuous power from PV solar modules (solar panels), battery, and the utility.
  • Page 4: Important Safety Warning

    2. Important Safety Warning Before using the inverter, please read all instructions and cautionary markings on the unit and this manual. Store the manual where it can be accessed easily. This manual is for qualified personnel. The tasks described in this manual may be performed by qualified personnel only.
  • Page 5 CAUTION! Under high temperature environment, the cover of this inverter could be hot enough to cause skin burns if accidentally touched. Ensure that this inverter is away from normal traffic areas. CAUTION! Use only recommended accessories from installer. Otherwise, not-qualified tools may cause a risk of fire, electric shock, or injury to persons.
  • Page 6: Unpacking & Overview

    3. Unpacking & Overview 3-1. Packing List Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package: Inverter unit PV connectors AC connector Mounting plate Fixing screws Software CD Manual USB cable...
  • Page 7: Installation

    4. Installation 4-1. Selecting Mounting Location Consider the following points before selecting where to install: Do not mount the inverter on flammable construction materials.  Mount on a solid surface  This inverter can make noises during operation which may be perceived as a ...
  • Page 8 Drill six holes in the marked Raise the inverter and place it over locations with supplied six screws. the mounting plate. The reference tightening torque is 35 N.m. 3. Fix the inverter in position by Check if the inverter is firmly secured. screwing the supplied two screws (M4*12) located on the top two sides of the inverter.
  • Page 9: Grid (Utility) Connection

    5. Grid (Utility) Connection 5-1. Preparation NOTE: The overvoltage category of the AC input is III. It should be connected to the power distribution. NOTE2: The inverter is built in a 63A/400V breaker to protect the inverter from AC power damage. WARNING! It's very important for system safety and efficient operation to use appropriate cable for grid (utility) connection.
  • Page 10 Step 5: Thread five cables through socket element (E) according to polarities indicated on it and tighten the screws to fix wires after connection. L1→ LINE 1 (Black) L2→ LINE 2 (Grey) L→ LINE 3 (Brown) → Ground (Yellow-Green) N→ Neutral (Blue) The reference tightening torque is 1.5-2.5 N.m.
  • Page 11: Pv Module (Dc) Connection

    6. PV Module (DC) Connection CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between inverter and PV modules. NOTE1: Please use 1000VDC/20A circuit breaker. NOTE2: The overvoltage category of the PV input is II. Please follow below steps to implement PV module connection: WARNING: Because this inverter is non-isolated, only three types of PV modules are acceptable: single crystalline and poly crystalline with class A-rated and CIGS modules.
  • Page 12 Crimping tool and spanner Cable preparation and connector assembly process: Strip one cable 8 mm on both end sides and be careful NOT to nick conductors. Insert striped cable into female terminal and crimp female terminal as shown below charts. Insert assembled cable into female connector housing as shown below charts.
  • Page 13 Step 4: Check correct polarity of connection cable from PV modules and PV input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector. Connect negative pole (-) of connection cable to negative pole (-) of PV input connector.
  • Page 14 Recommended Panel Configuration Solar Panel SOLAR INPUT 1 SOLAR INPUT 2 Total Q'ty of Spec. Input (Min in serial: 11pcs; panels (reference) Power Max. in serial: 18pcs) - 250Wp 11pcs in serial 11pcs 2750W - Vmp: 36.7Vdc - Imp: 6.818A 11pcs in serial 11pcs 2750W...
  • Page 15: Battery Connection

    7. Battery Connection CAUTION: Before connecting to batteries, please install separately a DC circuit breaker between inverter and batteries. NOTE1: Please only use sealed lead acid battery, vented and Gel battery. Please check maximum charging voltage and current when first using this inverter. If using Lithium iron or Nicd battery, please consult with installer for the details.
  • Page 16: Load (Ac Output) Connection

    8. Load (AC Output) Connection 8-1. Preparation CAUTION: To prevent further supply to the load via the inverter during any mode of operation, an additional disconnection device should be placed on in the building wiring installation. WARNING! It's very important for system safety and efficient operation to use appropriate cable for AC connection.
  • Page 17 L1→ LINE 1 (Black) L2→ LINE 2 (Grey) L→ LINE 3 (Brown) → Ground (Yellow-Green) N→ Neutral (Blue) The reference tightening torque is 1.0-1.5 N.m. Step 4: Push protective dome (D) on to socket element (E) until both are locked tightly. Then, twist protective element (D) and pressure dome (A) so that all cables are firmly connected.
  • Page 18: Communication

    9. Communication The inverter is equipped with several communication ports and it is also equipped with a slot for alternative communication interfaces in order to communicate with a PC with corresponding software. This intelligent slot is suitable to install with SNMP card and Modbus card.
  • Page 19: Dry Contact Signal

    Dry Contact Signal There is one dry contact available on the bottom panel. It could be used to remote control for external generator. 10-1. Electric Parameter Parameter Symbol Max. Unit Relay DC voltage Relay DC current Note: The application of the dry contact should not exceed the electric parameter shown as above.
  • Page 21: Relay Control Port

    Relay Control Port This port is available to provide a power source (230V/8A) to trigger external relay. This function is only valid for Grid-tie with backup II mode. 11-1. Interface Configuration There are four pins on this port. However, only Pin 1 and Pin 4 are worktable. Please use supplied cables to connect Pin 1 and Pin 4 shown as below charts.
  • Page 22: Application

    Condition 3: 230V Power on When the unit is not working at inverter mode or grid is available. 11-3. Application Below chart is recommended circuit wiring. 3-phase inverter...
  • Page 23: Application With Energy Meter

    Application with Energy Meter With Modbus card II and energy meter, hybrid inverter can be easily integrated into the existing household system. For details please refer to Modbus card II manual. Note: this application is only valid for Grid-Tie with Backup II mode. Equipped with Modbus card II, hybrid inverter is connected to energy meter with RS485 communication port.
  • Page 24: Commissioning

    Commissioning Step 1: Check the following requirements before commissioning: Ensure the inverter is firmly secured  Check if the open circuit DC voltage of PV module meets requirement (Refer to  Section 6) Check if the open circuit utility voltage of the utility is at approximately same to ...
  • Page 25: Initial Setup

    Initial Setup Before inverter operation, it’s required to set up “Operation Mode” via software. Please strictly follow below steps to set up. For more details, please check software manual. Step 1: After turning on the inverter and installing the software, please click “Open Monitor”...
  • Page 26 SECTION A: Standard: It will list local grid standard. It’s requested to have factory password to make any modifications. Please check local dealer only when this standard change is requested. CAUTION: Wrong setting could cause the unit damage or not working. Nominal Output Voltage: 230V.
  • Page 27 Allow to feed-in to the Grid: This option is only valid under Grid-tie and Grid-tie with backup modes. Users can decide if this inverter can feed-in to the grid. Allow battery to discharge when PV is available: This option is automatically determined by setting in “Load supply source (PV is available)”.
  • Page 28 It’s allowed to charge battery from PV power first. If it’s not sufficient, grid will charge battery. 2. PV only It is only allow PV power to charge battery. 3. None It is not allowed to charge battery no matter it’s from PV power or grid. Load supply source: When PV power is available: 1 PV, 2...
  • Page 29 PV energy supply priority setting: 1 Load, 2 Battery and 3 Grid. PV power will provide power to the load first. Then, it will charge battery. If there is any remaining power left, it will feed-in to the grid. Battery charging source: 1.
  • Page 30 Grid-tie with backup (III):  PV energy supply priority setting: 1 Load, 2 Grid and 3 Battery PV power will provide power to the load first. If there is more PV power available, it will feed-in to the grid. If feed-in power reaches max. feed-in power setting, the remaining power will charge battery.
  • Page 31 battery power is running out, grid will back up the load. NOTE: This option will become ineffective during AC charging time and the priority will automatically become 1 Grid and 2 Battery order. Otherwise, it will cause battery damage. Grid-tie with backup (IV): Users are only allowed to set up peak time and off- ...
  • Page 32 Battery charging source: PV and grid charge battery PV power will charge battery first during off-peak time. If it’s not sufficient, grid will charge battery. Load supply source: 1 PV, 2 Grid, 3 Battery When battery is fully charged, remaining PV power will provide power to the load first.
  • Page 33 Inverter mode. That means the transfer time from inverter mode to battery mode will be less than 15ms. Besides, it will avoid overload fault because grid can supply load when connected load is over 10KW. Battery charging source: 1.
  • Page 34 That means the transfer time from inverter mode to battery mode will be less than 15ms. Besides, it will avoid overload fault because grid can supply load when connected load is over 10KW. Battery charging source: 1. PV or Grid: If there is remaining PV power after supporting the loads, it will charge battery first.
  • Page 35 That means the transfer time from inverter mode to battery mode will be about 15ms. If connected load is over 10KW and grid is available, this inverter will allow grid to provide power to the loads and PV power to charge battery.
  • Page 36 Load supply source: When PV power is available: 1 PV, 2 Battery, 3 Grid PV power will provide power to the load first. If it’s not sufficient, battery power will back up the load. Only after battery power is running, Grid will back up the load. When PV power is not available: 1.
  • Page 37: Operation

    Operation 15-1. Interface This display is operated by four buttons. NOTICE: To accurately monitor and calculate the energy generation, please calibrate the timer of this unit via software every one month. For the detailed calibration, please check the user manual of bundled software. 15-2.
  • Page 38: Button Definition

    Indicates charging current to battery or discharging current from battery. Indicates that the warning occurs. Indicates that the fault occurs. Indicates fault code or warning code. Indicates date and time, or the date and time users set for querying energy generation. Indicates solar panels.
  • Page 39: Query Menu Operation

    Short press. Return to previous menu. Press and hold the button ESC/OFF until the buzzer Turn off power to the loads. continuously sounds. Short press. Select last selection or increase value. If it’s in query menu, press this button to jump to next selection or decrease value.
  • Page 40 Frequency, voltage, power or percentage of AC output  Procedure Input voltage or power of PV input. Procedure...
  • Page 41 Battery voltage or percentage.  Procedure Date and time.  Procedure...
  • Page 42: Operation Mode & Display

    Today or total energy generated.  Procedure 15-5. Operation Mode & Display Below is only contained LCD display for grid-tie with backup mode (I). If you need to know other operation mode with LCD display, please check with installer. Inverter mode with grid connected This inverter is connected to grid and working with DC/INV operation.
  • Page 43 PV power is generated, but not sufficient enough to charge battery by itself. PV power and the utility are charging battery at the same time. And the utility is also supplying power to the connected load. This inverter is disabled to generate power to the loads via AC output.
  • Page 44 PV power is sufficient to provide power to loads and feed power back to the grid. PV power and utility are providing power to the connected loads because of insufficient PV power. Inverter mode without grid connected This inverter is working with DC/INV operation and not connecting to the grid. LCD Display Description PV power is sufficient to charge...
  • Page 45 Bypass mode The inverter is working without DC/INV operation and connecting to the loads. LCD Display Description Only utility is charging battery and providing power to connected loads. Only utility is available to provide power to connected loads. Standby mode : The inverter is working without DC/INV operation and load connected.
  • Page 46: Charging Management

    Charging Management Default Charging Parameter Note Value It can be adjusted via software from Charging current 10Amp to 200Amp. It can be adjusted via software from Floating charging voltage (default) 54.0 Vdc 50Vac to 60Vdc. Max. absorption charging voltage It can be adjusted via software from 56.0 Vdc (default) 50Vac to 60Vdc.
  • Page 47 If using sealed lead acid battery, please set up the max. charging current according to below formula: The maximum charging current = Battery capacity (Ah) x 0.2 For example, if you are using 300 Ah battery, then, maximum charging current is 300 x 0.2=60 (A).
  • Page 48: Maintenance & Cleaning

    Maintenance & Cleaning Check the following points to ensure proper operation of whole solar system at regular intervals. Ensure all connectors of this inverter are cleaned all the time.  Before cleaning the solar panels, be sure to turn off PV DC breakers. ...
  • Page 49: Trouble Shooting

    Trouble Shooting When there is no information displayed in the LCD, please check if PV module/battery/grid connection is correctly connected. NOTE: The warning and fault information can be recorded by remote monitoring software. 18-1. Warning List There are 17 situations defined as warnings. When a warning situation occurs, icon will flash and will display warning code.
  • Page 50: Fault Reference Codes

    18-2. Fault Reference Codes When a fault occurs, the icon will flash as a reminder. See below for fault codes for reference. Situation Fault Solution Fault Event Possible cause Code Bus voltage over Surge 1. Restart the inverter. 2. If the error message still remains, please contact your installer.
  • Page 51 GFCI fault Leakage current 1. Check the wire and panels excceds the limit. which may cause the leakage. 2. If the error message still PV ISO fault The resistance remains, please contact your between PV and installer. ground is too low. INV DC current over Utility fluctuates.
  • Page 52: Specifications

    Specifications MODEL 10KW RATED POWER 10000 W PV INPUT (DC) Maximum DC Power 14850 W Nominal DC Voltage 720 VDC Maximum DC Voltage 900 VDC Working DC Voltage Range 300 VDC ~ 900 VDC Start-up Voltage / Initial Feeding Voltage...
  • Page 53 GENERAL PHYSICAL Dimension, D X W X H (mm) 622 x 500 x 167.2 Net Weight (kgs) INTERACE Communication Port RS-232/USB Optional SNMP, Modbus and AS-400 cards Intelligent Slot available ENVIRONMENT Protective Class Ingress Protection Rating IP20 Humidity 0 ~ 90% RH (No condensing) Operating Temperature -10 to 55°C (Power derating above 50°C) Altitude...

Table of Contents

Save PDF