Sharp MX-FN23 Service Manual page 21

Digital multifunctional system option
Table of Contents

Advertisement

3)
Remove the E-ring, the tray paper entry collar, and the parallel
pin, and remove the rear edge take-up roller.
I. Alignment roller lift solenoid
1)
Disconnect the connector, remove the screw, and remove the
roller lift solenoid.
NOTE: After fixing the roller lift solenoid, the plunger must be in
contact with the rear edge regulation plate in the free state.
Press the plunger with your finger to check to confirm that
the clearance between the take-up roller and the rear edge
regulation plate is 10 - 12mm.
0mm
J. Paper alignment motor F
1)
Remove the JAM release knob, the one-way coupling, the
Mylar, the pulley, the SP pin, the E-ring, and the bearing, and
remove the paper entry roller.
10 12mm
MX-FN23 DISASSEMBLY AND ASSEMBLY 8 – 5
2)
Remove the screw, and remove the upper stay left.
3)
Remove the E-ring, and remove the pressure release drive
gear. Remove the E-ring, and slide the bearing, and remove
the paper delivery pressure release PG unit.
4)
Remove the E-ring, the Mylar, the pulley, and the parallel pin.
Remove the E-ring, and slide the bearing, and remove the
paper delivery roller unit.
5)
Disconnect the connector. Remove the screw, and remove the
compiler.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents