4. Push the top front of the floor transmission tunnel sides in against the front vertical wall then, while
holding it in place, use your other hand in the transmission tunnel to position the bottom of the Front
Vertical wall so that it is located in the lower corner properly.
5. Attach a self-tapping screw in the bottom corner first and then the top corner to hold the panel in
place.
6. Repeat for the other side of the transmission tunnel.
7. Drill the panel for the rivet holes.
9. Remove the Front Vertical Wall panel.
8. Wipe and clean the aluminum panel and frame.
9. Apply silicone to the back side of the top tab of the panel.
2. Attach the top of the panel with self-tapping screws.
3. Pull the transmission tunnel walls back and silicone along the Front Vertical wall tab and the 1" tubes
in the transmission tunnel.
4. Attach the transmission tunnel walls to the Front Vertical and transmission tunnel tubes with self-
tapping screws.
5. Rivet the panels in place.
Note: If you are doing a Complete Kit build, makes sure that you use the Front Footbox panel
packed with the Wilwood Pedal box assembly
Transmission tunnel Front Vertical Wall positioned.