Tower Ups Installation - Liebert UPSTATION GXT 2U User Manual

Liebert power supply user manual
Hide thumbs Also See for UPSTATION GXT 2U:
Table of Contents

Advertisement

Tower UPS Installation

When using the GXT 2U in a tower configuration,
use the included support base (as shown) to sta-
bilize the UPS.
If any additional cabinets are added, they will
include spacers to accomodate the additional
cabinets.
Rack UPS Installation
Rack-Mount UPS Conversion and Installation
CAUTION:
1.
precautions when lifting or moving it.
2. Visually inspect the UPS for freight damage. Report damage to the
carrier and your local dealer or Liebert Representative.
3. NOTE: When rack mounted, the UPS MUST be supported by a
shelf, fixed rails or slide rails on each side. The Rack Mount Handles
WILL NOT support the weight of the UPS.
4. For slide rail installations, first remove the top/side fin. Top/side fin
slides forward and then lift up to remove. Optional rack-mount han-
dles are shipped with the UPS and maybe installed at this time if
desired.
5. Securing hardware and slide rails are sold separately. Please con-
tact your local dealer or Liebert Representative for these additional
options and any assistance needed. Fasten the slides into position
with the screws per the instructions included with the slide rail kits.
6. Locate UPS indoors in a controlled environment, where it cannot be
accidentally turned off. Locate it in an area of unrestricted airflow
around the unit, away from water, flammable liquids, gases, corro-
sives, or conductive contaminants. Maintain a minimum of 100 mm
INSTALLATION
The UPS is heavy (see specifications). Take proper
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents