Table Of Contents; Preface - LG 230/208V Service Manual

Lg service manual room air conditioner
Hide thumbs Also See for 230/208V:
Table of Contents

Advertisement

1.1 SPECIFICATIONS ..........................................3
1.2 FEATURES AND BENEFITS ..........................4
1.3 CONTROL LOCATIONS .................................6
1.4 ADDITIONAL CONTROLS..............................7
2.1 MECHANICAL PARTS....................................9
2.1.1 FRONT GRILLE .....................................9
2.2 AIR HANDLING PARTS................................11
FLOW FAN...........................................11
2.2.2 FAN ......................................................11
2.2.3 SHROUD..............................................12
2.3 ELECTRICAL PARTS ...................................12
2.3.1 OUTDOOR MOTOR ............................12
2.3.2 INDOOR MOTOR ................................12
2.3.3 COMPRESSOR ...................................12
2.3.4 CAPACITOR ........................................12
2.3.5 POWER CORD ....................................13
2.3.6 P.C.B....................................................13
2.4 REFRIGERATION CYCLE............................14

1. PREFACE

SERVICE MANUAL
This
parts etc. This room air conditioner was manufactured and assembled under a strict quality control system.
The refrigerant is charged at the factory. Be sure to read the safety precautions prior to servicing the unit.
1.1 SAFETY PRECAUTIONS
1. When servicing the unit, set the ROTARY SWITCH
or POWER SWITCH to OFF(O) and unplug the
power cord.
2. Observe the original lead dress.
If a short circuit is found, replace all parts which
have been overheated or damaged by the short
circuit.
3. After servicing the unit, make an insulation
resistance test to protect the customer from being
exposed to shock hazards.
CONTENTS
provides various service information, including the mechanical and electrical
-2-
2.4.1 CONDENSER ......................................14
2.4.2 EVAPORATOR ....................................14
2.4.3 CAPILLARY TUBE...............................14
3.1 HOW TO INSTALL THE UNIT ......................17
GRILLE ................................................18
3.2.3 UNIT INSTALLATION ..........................19
3.3 ELECTRICAL REQUIREMENTS ..................20
3.3.2 ELECTRICAL SAFETY ............................20
5. TROUBLESHOOTING GUIDE
5.1 OUTSIDE DIMENSIONS...............................26
5.2 PIPING SYSTEM ..........................................26
5.3 TROUBLESHOOTING GUIDE......................27
1.2 INSULATION RESISTANCE TEST
1. Unplug the power cord and connect a jumper
between 2 pins (black and white).
2. The grounding conductor (green or green & yellow)
is to be open.
3. Measure the resistance value with an ohm meter
between the jumpered lead and each exposed
metallic part on the equipment at all the positions
(except OFF or O) of the ROTARY SWITCH.
4. The value should be over 2M .
.................................21
.....................32
..................................33
.......34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lp120cemLp090hem

Table of Contents