Basic Sequence Of Operations - Canon LBP-860 Service Manual

Hide thumbs Also See for LBP-860:
Table of Contents

Advertisement

CHAPTER 2
E. Basic Sequence of Operations
prints on
roller trmpt~r~tr~re I-pachrs 172°C
After Ihc /PKNT signal has been
input front the video controller
until thr wanner motor beconws
ready (about ti seconds)
PRINT
(Print)
until thr primary voltage [DC)
After lhe primary voltage (DC)
turns OFF until the main motor
ROTATIONS
period)
Download Service Manual and Resetter Printer at http://printer1.blogspot.com
A4 paper
(Cassette feed)
Figure 2-6
Table 2-l
put the printu in the standby
state and clean the transfer
or
a
o r
t h e
the drum in preparation for
transfer charging roller.
transfer the image the paper.
the fLving roller to
charging roller.
To hold the fixing roller at
172°C to keep the printw
To stabilize the sensitivity of
printing and to clean the
To form an image on the
photosensitive drum according
the /VDO signal input from roller at 183°C.
the video controller and to
To deliver the final page of the
job and to clean the transfer
charging roller.
Remark
During this period, thr
printer checks the car-
there is toner in it.
If the printer stays in the
standby state for five
the main motor for one
second
roller, so that the
fixing roller will no1 be
deformed.
During this period, the
printer holds the fixing
If a /PRivf signal is inpu,
from the video controller,
the INlTL4L ROTATIONS
period be#ns

Advertisement

Table of Contents
loading

Table of Contents