Receiver Test Termination - Motorola V120x Instruction Manual

Motorola v120x mobile phone
Hide thumbs Also See for V120x:
Table of Contents

Advertisement

Receiver Test Termination

Test Status
Connected
Svc Opt 2/9
Testing
Passed
Failed
Max Frames
There are three possible outcomes for a confi-
dence interval receiver frame-error-rate test with
the HP 8924C:
1.When the HP 8924C determines that the
measured FER will meet the user specified
FER specification with the specified confi-
dence level, the test is halted and the Passed
indicator is activated.
2.The HP 8924C extends the TIA recommenda-
tion to also check for failures with the user
specified confidence level. In other words, if
the HP 8924C detects that the measured FER
will fail the user entered FER specification
with the specified confidence level, the test is
halted and the Failed indicator is activated.
This feature eliminates wasted time testing
phones that are clearly failing the test.
There are 3 possible outcomes to
CDMA
an FER Test:
•Passed:
meets the target FER speciÞcation with the
speciÞed conÞdence.
•Failed: this means that the measured FER does
not meet the target FER specification with the
speciÞed conÞdence.
•Max Frames:
indeterminate in that the measured FER could
neither pass nor fail the target FER
specification with the specific confidence in
the number of frames specified.
3.If neither the pass or fail conditions are met,
the FER test will run until the number of
frames counted equals the valued entered into
the Max Frames field. When this occurs, the
Max Frames indicator is activated. If the
confidence interval is turned off, the HP
8924C does not perform any confidence level
checking and the FER test will run until the
number of frames tested equals Max Frames.
46
Test Procedures
this means that the measured FER
this means that the test was
Motorola Confdential Proprietary

Advertisement

Table of Contents
loading

This manual is also suitable for:

120e

Table of Contents