EPSON Stylus &2/25 800
3. Remove 1 screw (CBS, 3X6, F/Zn) securing the pump assembly to the middle sub frame
assembly. (Refer to Figure 3-42.)
4. Remove the pump assembly from the middle sub frame assembly.
Be careful not to damage the tubes while removing the pump assembly.
Tightening torque for the screws (CBS, 3x6, F/Zn) = 8 ~ 10 kg-cm.
Never install the pump assembly into the printer mechanism before mounting the head
cleaner on the pump assembly. The head cleaner must not be mounted on the pump
assembly alone.
When mounting the head cleaner on the pump assembly, face the rubber part of the
cleaner to the right. Be sure to hook the hole in the head cleaner to the pump assembly,
as shown in Figure 3-43.
3-34
Download Service Manual and Resetter Printer at http://printer1.blogspot.com
Figure 3-42. Pump Assembly Removal
CAUTION
Rev. A