Download  Print this page

Advertisement

QQ
3 7 63 1515 0
Note: Follow the assembly procedure in the numerical order given.
OPTICAL PICK-UP COMPLETE ASSY
TE
L 13942296513
shaft (A)
GEAR (LOMINI)/(LOAD CAM) ASSY
gear (LOAD 2)
marking
Fig. A
www
.
3 Attach the gear (LOAD CAM) assy
with its facing inside.
16
http://www.xiaoyu163.com
SECTION 3

MECHANISM DECK ASSEMBLY

1 Move the lever (LOCK 3A) in the direction of arrow A ,
and return it a little in the direction of arrow B
from the position where the chuck plate is moved
chuck plate
down to the lower limit.
B
gear (LOMINI)
chuck plate
x
ao
u163
y
slit
i
http://www.xiaoyu163.com
2 9
8
A
3 stop ring 2.0 (E type)
4 tension spring (DH)
Q Q
3
6 7
1 3
1 5
2 optical pick-up complete assy
Note: Insert the shaft (A) first.
2 Attach the gear (LOMINI) at the position
shown in Fig. A.
shaft (rotary prevention C)
1 Move the lever (LOCK 3A)
B
fully in the direction of arrow B
to move the chuck plate up.
co
.
4 stop ring 1.5 (E type)
9 4
2 8
0 5
8
2 9
9 4
2 8
m
9 9
9 9

Advertisement

Table of Contents

Comments to this Manuals

Symbols: 0
Latest comments: