Testing The Installation And Telephone Changes - Toshiba VP 300 Installation Instructions Manual

Voice processing
Table of Contents

Advertisement

3.12

TESTING THE INSTALLATION AND TELEPHONE CHANGES

The following checklist is intended to help track the installation and telephone changes.
The "See Chapter" column refers you to the appropriate chapter in the Installation and
Maintenance manual for further information.
The "Person Responsible" column is for use to track who is responsible for the item.
The "Scheduled" column indicates when the item is to be completed.
The "Completed" column is for the date of final completion for that item.
Receiving the Equipment
_____ Inspect for Damage
_____ Carton
_____ Cabinet
_____ Reshipping Procedures
Pre-Installation
_____ Environment
_____ Dust Free (Y/N)
_____ Away from Large Motors
_____ Cabinet Accessible (Y/N)
_____ Power
_____ Dedicated fuse or breaker
_____ Dedicated 115V 60hz AC
_____ Other Required Equipment
_____ Modular line cord
_____ RJ11 jacks/equivalent
_____ 66M4-4W connector block
_____ 10-ft male-to-female 25-
_____ Self-tapping sheet metal
_____ AC/DC cables secure
_____ Printed Circuit Cards
(Y/N)
Receptable
pair connectors
screws
See
Person
Chapter
Responsible
INSTALLATION
INSTALLATION
Toshiba VP Systems Release 7.1
INSTALLATION
3-45
Scheduled Completed
July, 1994

Advertisement

Table of Contents
loading

Table of Contents