Installing the operator information panel
To install the operator information panel, complete the following steps.
Operator information
panel assembly
1. Install the operator information panel in the server and secure it with the two
2. Connect the signal cable and the USB cable to the operator information panel.
3. Install the cover (see "Installing the cover" on page 31).
4. Slide the server into the rack.
5. Reconnect the power cords and any cables that you removed.
6. Turn on the peripheral devices and the server.
50
IBM System x3455 Type 7940 and 7941: Problem Determination and Service Guide
mounting screws.