Advertisement

PERF
Pre-installation
Installation
PumpWise guidelines
General specification
Trouble shooting
PumpWise and warranty
Pump installation and
warranty guide for pumps
RGP, RHP, RSP and ESP
ISSUE 14 September 2011
SAL6479 Pumps Install DocAW1 .indd 1-1
29/09/2011 11:27

Advertisement

Table of Contents
loading

Summary of Contents for Salamander RGP

  • Page 1 PERF Pre-installation Installation PumpWise guidelines General specification Trouble shooting PumpWise and warranty Pump installation and warranty guide for pumps RGP, RHP, RSP and ESP ISSUE 14 September 2011 SAL6479 Pumps Install DocAW1 .indd 1-1 29/09/2011 11:27...
  • Page 2: Table Of Contents

    Pump installation and warranty Contents guide for pumps RGP, RHP, RSP and ESP Important – read this first! Pre-installation checklist Typical installations Correct installation is the guarantee of safety and a RSP and RHP pumps trouble free system. It is therefore important to read these ESP CPV pumps instructions thoroughly and ensure you comply with them.
  • Page 3: Pre-Installation Checklist

    Never install in a bathroom unless in an bathroom, 80 gallons for one bathroom and Never fit the pump directly to the cold via a Salamander approved flange enclosed space and access is only possible one en-suite shower room). water mains.
  • Page 4 Note: the couplers; two angled and two straight. accessible at all times. RSP 50 and RGP 50 are supplied with For all pumps, the inlets are on the side of The pump must not be installed in a...
  • Page 5: Typical Installations Rsp And Rhp Pumps

    Vent and Inlet Usable capacity other services • L.E.D. indication of system function and Usable capacity specified by Salamander. Inlet minimum 50 gallons Cold water storage per bathroom any unforeseen system malfunction minimum 50 gallons...
  • Page 6: Esp Cpv Pumps

    Only after two (2) hours of persistent ON OFF ON OFF hunting due to a Negative head operation Salamander positive head pumps require a Fit an dripping (tap or shower) outlet. Negative head equilibrium –...
  • Page 7: Typical Installations Esp Cpv Pumps

    Pre-installation Pre-installation Installation Installation PumpWise guidelines PumpWise guidelines General specification General specification Trouble shooting Trouble shooting PumpWise and warranty PumpWise and warranty Fig 14 Large whole house Typical installations – ESP CPV pumps Fig 13 Tank fed hot Tank fed (hot) with cold water mains cold Large whole house system with the ESP CPV systems MUST use Right ESP CPV.
  • Page 8: Commissioning

    Pre-installation Pre-installation Installation Installation PumpWise guidelines PumpWise guidelines General specification General specification Trouble shooting Trouble shooting PumpWise and warranty PumpWise and warranty Commissioning Helpful guidelines Cold water supplies and storage Before you finish • DO NOT RUN PUMP DRY – to do so will cause irreparable damage to Recovery of cold storage Cold storage usable capacity...
  • Page 9: Water Starvation Protection, Pipework Arrangements And Stored Hot Water

    (WSP) may be considered. positioned above the hot outlet from the The WSP is a Salamander level switch which cylinder. The AGL which limits aeration must be positioned 102mm higher than the...
  • Page 10 Pre-installation Pre-installation OLD STYLE DO NO OLD STYLE DO NOT USED Installation Installation PumpWise guidelines PumpWise guidelines Fig 27 Inverted loops Fig 25 Horizontal cylinders ig 23 Anti gravity loops General specification General specification Trouble shooting Trouble shooting PumpWise and warranty PumpWise and warranty Air vents, both Usable capacity...
  • Page 11: General Specifications

    Mechanical seals never exceed 65°C. A stored hot water such systems there exists the possibility the All Salamander pumps are designed to boost Scale deposits in water supplies can cause temperature of 60°C is considered sufficient pump will hunt ON-OFF-ON etc at intervals.
  • Page 12: Trouble Shooting

    Fault Probable cause Recommended solution Pump will not Electrical Check power supply Reduced/ Incorrect or no Check that installation complies with Salamander instructions start intermittent flow anti-aeration flange fitted Check fuse Check circuit breaker Insufficient gravity flow See above Inlet/outlet connections...
  • Page 13: To The Installer

    Warranty. with: Salamander customers benefit from a full a That the pump has been installed in accordance with the installation instructions, guidance and advice two year warranty on the RSP, RGP, RHP SAL6479 Pumps Install DocAW1 .indd 22-23 29/09/2011 11:28...
  • Page 14 Pre-installation Installation PumpWise guidelines General specification Trouble shooting PumpWise and warranty Notes SAL6479 Pumps Install DocAW1 .indd 24-25 29/09/2011 11:28...

Table of Contents