2-2. REMOVAL OF TB2 BOARD AND ST1 BOARD
1. Heat sink tape left
2. Two screws 1.7 x 5
3. Cover condenser
4. Heat sink left
5. Screw 1.7 x 2.5
6. Assy, cabi front
7. Remove the solder.
8. Two screws 1.7 x 7
4
3
2
When assembling,
tighten the screws order.
A → B
15
7
13
A
14
10
12
9. Assy, lamp SV
10. Two screws 1.7 x 3.5
11. Connector (CN106)
12. Stand
13. Remove the solder.
14. TB2 board
15. ST1 board
1
B
10
a
8
9
When assembling,
tighten the screws order.
a → b
– 11 –
11
8
b
6
5