Fujitsu Eternus DX80 S2 Hardware Installation page 7

Hide thumbs Also See for Eternus DX80 S2:
Table of Contents

Advertisement

Rack Mounting (3)
Push the M5 cage nut into the
2nd hole of the front rack pillar
Above the base line of the Enclosures
At the left hand side fix the slide
rail to the front pillar with
The M5 centering screws
The M5 pan head screws
Hardware Installation
ETERNUS DX80 S2 and DX90 S2
Base line of the
Controller Enclosure
6
Copyright Fujitsu Technology Solutions, Release August 2011
M5 Cage nut
M5 Centering
screw (10 mm)
M5 Pan head
screw (10 mm)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx90 s2

Table of Contents