Preparations - Panasonic WJ-GXE100 Installation Manual

Network video encoder
Hide thumbs Also See for WJ-GXE100:
Table of Contents

Advertisement

Preparations

The screws used to mount the unit to a wall or ceiling are not supplied.
Prepare the screws according to the material, structure, strength and other factors of the mounting
area and the total weight of objects to be mounted.
IMPORTANT:
• Purchase 2 screws (M3) according to the material of the installation area. Nails cannot not be
used for mounting.
• Required pull-out capacity of a single screw/bolt is 196 N {44.06 lbf} or more.
• Do not mount this product on a plaster board or a wooden section because they are too weak.
If this product is unavoidably mounted on such a section, the section shall be sufficiently rein-
forced.
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wj-gxe100e

Table of Contents