Major Operating Controls - Panasonic WJ-GXE100 Installation Manual

Network video encoder
Hide thumbs Also See for WJ-GXE100:
Table of Contents

Advertisement

Major operating controls

12 V DC
power supply terminal
Mounting hole q
About the [INITIAL SET] button
After turning off the power of the unit, turn on the power of the unit while holding down this button,
and wait for around 5 seconds or more without releasing this button. Wait around 2 minutes after
releasing the button. The unit will start up and the settings including the network settings will be ini-
tialized. Do not turn off the power of the unit during the process of the initialization. Before initializing
the settings, it is recommended to write down the settings in advance.
14
Network connector
Live indicator
Ventilation area
(also on the other side of the unit)
<About the live indicator>
When the power is
turned on
When connected to a
network (not accessed)
When connected to a
network (accessed)
INITIAL SET button
Lights green
Lights orange
Blinks orange/
Blinks green
Mounting hole w

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wj-gxe100e

Table of Contents