Removing And Installing Main (Centre) Stand - BMW R 1150 GS Repair Manual

Hide thumbs Also See for R 1150 GS:
Table of Contents

Advertisement

1
Removing and installing main
(centre) stand
Remove the sump guard.
00 1 520
Secure stand, BMW No. 00 1 520, to motorcycle
with overlength bushes and screws,
BMW No. 00 1 527.
L
Note:
Mount a washer on the screw on the right as viewed
in the forward direction of travel.
Depth of thread in tapped bore has been reduced!
Disconnect tension springs.
Remove machine screws (1) in bearing
bushings (2).
Remove right and left bearing bushings (2).
46.6
2
Disconnect the plug from the side stand switch.
Remove the main (centre) stand.
Remove right and left bearing blocks (2).
Installation is the reverse of the removal proce-
dure.
R21110030
L
Note:
When installing the springs, make sure that the thick
spring is on the inside and the thin spring on the
outside (arrow).
Lubricant:
for pivot bushings.............. Staburags NBU 30 PTM
v
243
3
R21460050
R21460140
2
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

R 1100 sR 1200 cR850

Table of Contents