Location Adjustment And Confirmation Of Tension Post; Tension Pole And Back Tension Adjustment - Samsung SV-627X Service Manual

Hide thumbs Also See for SV-627X:
Table of Contents

Advertisement

2-4 Location adjustment and Confirmation of Tension Post

1) Remove the holder cassette assÕy and then push
the lever FL Arm-R to the direction of loading.
2) Push the lever tension drive Πin the direction of
arrow. (See Fig. 2-11)
3) Turn the gear worm wheel ´ clockwise so that
ÒTiming PointÓ of the slider FL drive ˇ and gear
FL cam ¨ can be aligned (See Fig. 2-12)
ΠLEVER TENSION DRIVE
Fig. 2-11
¨ GEAR FL CAM
ˇ SLIDER FL DRIVE
Fig. 2-12
Samsung Electronics
LEVER TENSION
TIMING POINT
´ GEAR WORM WHEEL
4) As rotating Disk S Reel
region of adjusting in the Main Base (in shape of
slit) clockwise or counterclockwise after inserting
screw driver in the slit on Main Base. Adjust the
left end edge of Lever Tension AssÕy ˇ to 1.3
+1.5/-0.5mm from the location of mark in the
Main Base.
5) As rotating Disk S Reel Œ, double-check the loca-
tion of the left end edge of Lever Tension AssÕy
and the quantity of crossing from mark on Main
Base. (+1.0/-0.5mm)
Counterclockwise : Torque UP
Clockwise
: Torque DOWN
Back Tension should be 56 ± 15g.cm at inspecting it
with Back Tension Meter.
1.0mm
1.3
0.5mm
ADJUSTING SLIT
Fig. 2-13 Tension Pole and Back Tension Adjustment
Note :
1) Mark on Main Base is located in about 1.3mm
from inside of bending line.
2) Be careful not to deform the region of adjusting on
Main Base up and down at adjusting.
Alignment and Adjustment
Πclockwise and the
ˇ LEVER TENSION ASS'Y
´ ADJUSTING
ΠDISK S REEL
2-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents