178
178
d)
Quality and reliability deliverables list
During product creation RFQ milestone the DQE has to provide deliverables list to supplier and discuss with them to
perform quality and reliability evaluation and testing report per request in list to DQE for design quality and reliability
review and validation.
For second panel or 3rd panel project, DQE will only test the related necessary items to confirm the panel quality
and system reliability:
Test Item
1
Front of screen tests
1.1
Brightness/Contrast
1.1.1
Brightness control range
1.1.2
Contrast control range
1.1.3
Luminance uniformity
1.1.5
Contrast ratio
1.1.6
Luminance-full white
1.1.7
Dimming range
1.1.8
Contrast vs. viewing angles
1.1.9
Luminance variation curve
1.2
Colour
1.2.1
Colour Temperature
1.2.2
Chromaticity
1.2.3
Chromaticity uniformity
1.2.4
Colour saturation
1.2.5
Color tracking
1.2.7
Hue/Tint control range
1.2.8
Colour transition
1.2.9
Colour shift vs. viewing angles
1.2.10
Gamma value
1.2.11
RGB and W Gamma curve
1.3
Image
1.3.1
Geometry
1.3.2
Over/Under Scan
1.3.3
Centring error
1.3.4
Position/Rotation
1.3.6
Jitter/Flicker/Flag waving
1.3.7
Cross talk
1.3.8
Residual image
1.3.9
Image sticking
1.3.10
Brush effect (PDP)
1.3.11
Halation
1.3.12
Luminance loading
1.3.13
Pixel defects
MMD Milestone
2nd or 3rd panel
EVT
DVT
PVT
EVT
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
DVT
PVT
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v