Installation

InSTallaTIon
Remove shipping block under blower housing.
Loosen compressor mounting bolts.
The installer should comply with all local codes
and regulations which govern the installation of
this type of equipment. Local codes and
regulations take precedent over any
recommendations contained in these instructions.
In lieu of local codes, the equipment should be
installed in accordance with the recommendations
made by the National electric code, and in
accordance with the recommendations made by
the National Board of Fire Underwriters. All local
seismic codes for seismic restraint of equipment,
piping, and duct work shall be strictly adhered to.

MounTInG VerTICal unITS

Vertical units up to six tons are available in left or
right air return configurations. Vertical units should
be mounted level on a vibration absorbing pad
slightly larger than the base to minimize vibration
transmission to the building structure. It is not
necessary to anchor the unit to the floor. (See
Figure #1).
If the unit is located in a confined space such as a
closet, provisions must be made for return air to
freely enter the space.
figure #1 – Vertical unit on vibration pad
Revised 01-11
VIBRATION
PAD
FULL SIZE
Subject to change without prior notice
CP/BP Series

MounTInG HorIzonTal unITS

While horizontal units may be installed on any
level surface strong enough to hold their weight,
they are typically suspended above a ceiling by
threaded rods. The rods are usually attached to
the unit corners by hanger bracket kits (P/N
930-008). (See Figure #2). The rods must be
securely anchored to the ceiling. Refer to the
hanging bracket assembly and installation
instructions for details. Horizontal units installed
above the ceiling must conform to all local codes.
An auxiliary drain pan if required by code should
be at least four inches larger than the bottom of
the heat pump. Plumbing connected to the heat
pump must not come in direct contact with joists,
trusses, walls, etc.
figure #2 – Typical horizontal unit hanging bracket
Some applications require an attic floor installa-
tion of the horizontal unit. In this case the unit
should be set in a full size secondary drain pan on
top of a vibration absorbing mesh. The secondary
drain pan prevents possible condensate overflow
or water leakage damage to the ceiling. The
secondary drain pan is usually placed on a ply-
wood base isolated from the ceiling joists by
additional layers of vibration absorbing mesh. In
both cases, a 3/4" drain connected to this second-
ary pan should be run to an eave and able to drain
to a location that will be noticeable. If the unit is
located in a crawl space, the bottom of the unit
must be at least 4" above grade to prevent flood-
ing of the electrical parts due to heavy rains.
Locate the heat pump unit in an area that provides
sufficient room to make water and electrical
connections, allowing easy removal of the access
6 720 220 045
5