Installing the Switch
Installation Procedures
W A R N I N G
E q u i p m e n t
C a b i n e t
N o t e
2-8
LED Behavior
After Initialization:
The Power LED remains on.
•
The port Link/Act and Spd LEDs on the front of the switch go into their
•
normal operational mode:
If the ports are connected to active network devices, the Link/Act
–
LEDs stay on or may be blinking to indicate port activity. The Spd
LEDs turn on for 100 Mbps links (100/1000 Mbps links on the
V1410-24-2G Switch) or stay off for 10 Mbps links.
–
If the ports are not connected to active network devices, the Link/
Act and Spd LEDs will stay off.
If the LED display is different than what is described above, the self test
has not completed correctly. Refer to chapter 4,
diagnostic help.
3. Mount the Switch
After the switch passes self test, it is ready to be mounted in a stable location.
The switch can be mounted in these ways:
■
on a horizontal surface
■
on a wall
■
under a table
■
rack or cabinet (V1410-16 Switch, V1410-24 Switch, and V1410-24-2G
Switch only)
Rack or Cabinet Mounting
The V1410-16 Switch, V1410-24 Switch, and V1410-24-2G Switch can be rack
mounted using the included brackets.
Note that the mounting brackets have multiple mounting holes and can be
rotated allowing for a wide variety of mounting options. Secure the rack in
accordance with the manufacture's safety guidelines.
For safe operation, please read the mounting precautions on
page
2-3, before mounting a switch.
The 12-24 screws supplied with the switch are the correct threading for
standard EIA/TIA open 19-inch racks. If installing the switch in an equipment
cabinet such as a server cabinet, use the clips and screws that came with the
cabinet in place of the 12-24 screws that are supplied with the switch.
"Troubleshooting"
for