Daikin RXYQ5PY1 Service Manual: Installation Of Outdoor Unit

Daikin r-410a heat pump 50hz/60hz cooling only 50hz.
Hide thumbs

Advertisement

Installation

3.2.14 Installation of Outdoor Unit

! Operational steps
Foundation of Units
Y groove
Except 5Hp Modeles
Notes:
1. The proportions of cement : sand : gravel for the concrete shall be 1 : 2 : 4, and ten
2. The surface shall be finished with mortar. The corner edges shall be chamfered.
3. When the foundation is built on a concrete floor, rubble is not necessary. However, the
4. A drain ditch shall be made around the foundation to thoroughly drain water from the
5. When installing the equipment on a roof, the floor strength shall be checked, and water-
6. Y groove unnecessary for 5HP Models.
7. When selecting the piping from the bottom, provide the height 200mm or more from a base.
78
Prepare foundation
When building a
When building a
foundation on the
foundation on the
ground
concrete floor
groove
groove
X - X cross section
reinforcement bars that their diameter are 10mm, (approx. 300mm intervals) shall be placed.
surface of the section on which the foundation is built shall have rough finish.
equipment installation area.
proofing measures shall be taken.
Install outdoor unit
(V1150)
Drain ditch
(Smooth down grade of about 1/50)
Drain ditch
Floor
Model
5HP
RX(Y)Q5PY1, YL
8.10HP
Q8•10PY1, YL
12•14•16•18HP
RX(Y)Q12•14•16•18PY1, YL
Foundation bolt type: JA
Size M12
Nut
Four bolts are required
Spring washer
3 thread ridges
Frame
Foundation bolt executing method
When installing multiple units in connection
497
792
1 102
General Information
SiEN34-705
697
992
1302
C:3D040102P

Advertisement

   Related Manuals for Daikin RXYQ5PY1

Comments to this Manuals

Symbols: 0
Latest comments:
  • GMacD Dec 22, 2015 11:58:
    Your website is crap in providing useful informatio​n on your products.