Download  Print this page

Daikin RXYQ5PY1 Service Manual Page 283

R-410a heat pump 50hz/60hz cooling only 50hz.
Hide thumbs

Advertisement

SiEN34-705
<In case of multi system: RXYQ20-54P(E)>
Note:
<Connecting Refrigerant Piping>
! When connecting the piping on site, be sure to use the accessory piping.
! Make sure the onsite piping does not come into contact with other piping or the bottom frame
<Multi Systems>
! The 5HP type cannot be used as an independent unit in a multi system.
! The Outdoor unit multi connection piping kit (sold separately) is needed when connecting
Installation Manual
Gas side shutoff valve
Gas side accessory pipe (1)
Remove the knock hole on the bottom frame and
route the piping under the bottom frame.
Gas side shutoff valve
Gas side accessory pipe (2)
or side panels of the unit.
piping between outdoor units.
Refer to the installation manual that comes with the kit when doing this piping work.
If connected to the front
Remove the shutoff valve cover to connect.
Liquid side shutoff valve
Liquid side accessory pipe (1)
When connected at lateral side (bottom)
Liquid side shutoff valve
Brazing
figure 15
Heat Pump 60Hz (RXYQ5~54P)
Refrigerant charge port
Brazing
Refrigerant charge port
Brazing
Liquid side accessory pipe (2)
Knockout hole
Punch the knock hole.
277

Advertisement

   Related Manuals for Daikin RXYQ5PY1

Comments to this Manuals

Symbols: 0
Latest comments:
  • GMacD Dec 22, 2015 11:58:
    Your website is crap in providing useful informatio​n on your products.