6. Hand Over to Customer

6.1
Operational Steps
Important Points
a) The measurements taken during the test run should be recorded and kept on a test run inspection
b) Do not forget to record the length of the refrigerant piping and the refrigerant additional charging
c) Explain to the customer how to operate the equipment and let him try it.
d) Assemble all the relevant diagrams and other printed matter which is required to operate the system
List of equipment which has been
delivered
Contract drawings
1 set of operation manuals
Names of those responsible for the
work (emergency contact address)
Equipment guarantees
e) Make the service contact address clear.
General Information
Make final report
Complete test run
(test run
inspection sheet)
sheet.
volume on the plate on the back of the outdoor unit external notice board, as this information will be
required for servicing the system.
and hand it all over to the customer (on the spot) and tell him to keep it.
Customer
Explain how to
operate
equipment
It is essential to prepare a control wiring diagram
which clarifies the refrigerant system and the
control system.
System design documents
Hand Over to Customer
Hand over relevant
printed materials
(V1050)
127

Advertisement

   Related Manuals for Daikin RXYQ5PY1

Comments to this Manuals

Symbols: 0
Latest comments:
  • GMacD Dec 22, 2015 11:58:
    Your website is crap in providing useful informatio​n on your products.