Derbi Rambla 250 Manual page 167

Table of Contents

Advertisement

Injection
11
Checking the resistance at the injector ends: 14.5 ± 5% Ohm
Check the efficiency of 15A fuse No.4 of the injection load.
Check the efficiency of the injection load remote
control: Check the resistance of the energising coil
between pins 86 and 85: 80 ÷ 120 Ohm.
Apply a voltage of 12V to pins 86 and 85; make
sure that there is continuity between pins 30 and
87 of the remote control.
Check the power supply line of the injection load
remote control energising coil: after switching the
line "ON", make sure there is battery voltage for
two seconds between the Green-Red cable and
the Black-Purple cable of the remote control base.
If there is none, check the continuity of the Green-
Red cable between the fuse box in the battery
compartment and the remote control base and of
the Black-Purple cable between pin 8 of the control
unit and the remote control base.
NOTE
CONTINUITY TESTS MUST BE CARRIED OUT WITH THE
COMPONENTS DISCONNECTED. (BATTERY, REMOTE
CONTROLS, CONTROL UNIT, FUSES, ETC.).
Specification
Electric fan remote control
Desc./Quantity
INJEC - 167

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents