Starting-Up And Shutting Down The Machine; Starting-Up The Machine - Technoware EVO STAR 10 Installation And User Manual

Uninterruptible power supply
Table of Contents

Advertisement

Tecnoware Power Systems

4 STARTING-UP AND SHUTTING DOWN THE MACHINE

4.1 STARTING-UP THE MACHINE

CAUTION!: IF THE BATTERY BREAKER IS CLOSED, BEFORE STARTING UP,
CAN CAUSE U.P.S DAMAGE.
4.1.1
U.P.S with independent reserve line
1. Make sure that the wires are correctly connected respecting the cyclic sense of the phases
U,V,W.
2. Make sure that the "Manual By-pass" switch is turned off and blocked by its blocking device
3. Give power to the mains.
4. Close the "Reserve switch" breaker, the display will turn on and the message "UPS
STOPPED" will appear, all the synoptic led's (pag 23) will be red except led "H " which
remain green; wait till led "A" (picture 17) start flashing, if this does not happen the supply
voltage is not adequate or the cyclic sense of the phases is incorrect, therefore you must
disconnect the equipment, verify the connections and start this procedure again from the
beginning.
5. Close the "Mains switch" and "Output switch" breakers, led's "G and B" (picture 17) will
turn green.
6. Press the
button for about two seconds, on the display the message "switch on
procedure started" will appear, if the steps of procedure have been followed correctly led
"C" (picture 17) and led "E" will become green and the message "UPS in alarm mode" will
appear.
7. Once you have carried out the turning on procedure and led's "C" and "E" are green, it is
possible to close the "Battery switch" breaker and led "D" will be green.
8. If installation has been correctly carried out and the turning on procedure done
successfully, the message "UPS in normal operation operation" will appear and all the
synoptic led's will be green.
9. Go to paragraph 4.1.3
4.1.2
First time starting-up
If the turning on procedure has been carried out for the first time we advise you to continue
this procedure to verify the real efficiency and to get familiar with the system.
1. Select the language you wish to use by following the indications in the menu
1a/b).
2. Carry out the battery test (see 6.1.2.2) and verify the outcome.
3. Carry out the complete by-pass procedure with the U.P.S. switched on (paragraph 5.1) and
all operations to restore the by-pass.
Carry out a power shortage test by turning off the "Mains switch" and make sure that the
U.P.S. goes into alarm mode and that led D starts flashing and led F stays green (picture 1and
7) then turn on the "Mains switch" and check that normal functioning has been restored.
EVO STAR 10-50
25
(diagram