Mazda 323 Workshop Manual Supplement page 85

Mazda 323 4-wheel drive workshop manual supplement
Hide thumbs Also See for 323:
Table of Contents

Advertisement

B2
INSTALLATION
93GOB2-74
1
93GOB2-743
82-32
4. Connect
the air pipe to the throttle
body, and tighten
the
hose clamp.
5. Connect
air hose @ to the wastegate
diaphragm,
and se-
curely
tighten
the hose clamp.
6. Install
nut @
Tightening
torque:
19-25
Narn (1.9-2.6
m-kg,
14-19
ft-lb)
7. Install the intercooter
bracket
and tighten
nuts @J .
Tightening
torque:
7.8-l
1 Narn (80-I
IO cm-kg,
69-95
in-lb)
Air pipe
and air bypass
valve
assembly
1. Connect
the air pipe to the turbocharger,
and securely
tight-
en the hose clamp.
2. Install
and tighten
the bolt @ .
Tightening
torque:
7.8-l
1 Nom (80-I
10 cm-kg,
69-95
in-ib)
3. Connect
air hose @and
Q1 and securely
tighten
the hose
clamps.
Battery
duct
1. install the battery
duct.
Radiator
and tooting
fan assembly
1. Install the radiator
and cooling
fan assembly.
Tightening
torque:
7.8-l
1 Nm
(80-l
10 cm-kg,
69-95
Mb)
2. Connect
the tooting
fan connector.
3. Connect
the radiator
switch connector.
4.
Connect
the oil cooler
hose.
5. Connect
the coolant
reservoir
hose.
6. Connect
the upper
and lower radiator
hoses.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents