i
CD PLAYER ADJUSTMENTS
a.
REPLACEMENT
AND LUBRICATION
OF THE PICK-UP
Q
-#
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Remove
Ihe pick-up
advance gear
(2).
Remove
the brackets
(6) securing
the pick-up rail in place.
V*
*
—
FLOIL (G-425A)
Pull out the pick-up
rail (5).
1
If the pick-up
is reconditioned
or replaced,
be sure [o wipe
the rails clean and also apply a coaling of FLOIL
(G-425A)
10 their entire circumference
and
enlire length.
After replacement,
inslall the shaft as before.
The pick-up P. C. Board pattern is
"shorted",
as shown in
the figure , so that the new pick-up will not be susceptible
to
Ihe effects of static.
FLOI
Set the pattern to
"Open"
after the pick-up has been
(G-425A)
I
replaced.
P
"a
7
w~~
FLOIL
~
I
1
(G-425A)
~
I
\
SHORT
~
OPEN
NOTE ;
In order to prevent
damage
by static electricity
during
shipment,
the indicated
patterns
on the
pick-up P.C. Board are short-circuited
by solder.
After
the
pick-up
replacement,
remove
the
solder that is short-circuiting
the patterns.
b.
REPLACEMENT
OF THE
SLED
MOTOR
Check the position of the red mark on the bottom of the
motor, as shown in the diagram.
c.
LUBRICATION
OF THE CD MECHANISM
.
Be
sure, at this time, not to touch any oiher part.
NOTE : FLOIL (G-425A)
-6
FLOIi_(G-425A)
~
"432,
~FLOIL
(
/10
-8-