Connecting Pipings And The Cable To Outdoor Unit - LG AMNH096VEA0 Service Manual

Multi type air conditioner
Hide thumbs Also See for AMNH096VEA0:
Table of Contents

Advertisement

Connecting Pipings and the cable to Outdoor unit

1. Connecting the pipings to the Outdoor
unit
1) When piping installation work you must be used the
connector.
Indoor Units
18K/24K
Ø9.52¡Ø12.7
Ø9.52 ¡Ø15.88
30K/36K
A
*Connecting pipe size
Indoor Units
Gas side
7K/9K/12K
Ø9.52(3/8)
18K/24K
Ø12.7(1/2)
30K/36K
Ø15.88(5/8)
2) Align the center of the pipings and sufficiently tight-
en the flare nut by hand
CAUTION: After the confirmation of the above conditions, prepare the wiring as follows:
1) Never fail to have an individual power specialized for the air conditioner. As for the method of wiring, be guided by
the circuit diagram pasted on the inside of control box cover.
2) The means for disconnection from a power supply shall be incorporated in the fixed wiring and have an air
gap contact separation of at least 3mm in each active(phase) conductors.
3) The screw which fasten the wiring in the casing of electrical fittings are liable to come loose from vibrations
to which the unit is subjected during the course of transportation. Check them and make sure that they are all
tightly fastened. (If they are loose, it could give rise to burn-out of the wires.)
4) Specification of power source.
5) Confirm that electrical capacity is sufficient.
6) See to that the starting voltage is maintained at more than 90 percent of the rated voltage marked on the
name plate.
7) Confirm that the cable thickness is as specified in the power sources specification.
(Particularly note the relation between cable length and thickness.)
8) Never fail to equip a leakage breaker where it is wet or moist.
9) The following troubles would be caused by voltage drop-down.
• Vibration of a magnetic switch, damage on the contact point there of, fuse breaking, disturbance to the normal function
of a overload protection device.
• Proper starting power is not given to the compressor.
Gas
Liquid
A ¡ B
Not available
Not available
B
Liquid side
Ø6.35(1/4)
Ø6.35(1/4)
Ø6.35(1/4)
Connector
3) Finally, tighten the flare nut with torque wrench until
the wrench clicks.
I When tightening the flare nut with torque wrench,
ensure the direction for tightening follows the arrow on
the wrench.
Outdoor unit
4) Distributor type piping (only A4UW306FA1)
1) Connect main piping from outdooor to BD unit using
socket.
2) Socket is fitted in BD unit
(Socket P/No.: 5001A30059A)
Installation
A-UNIT
Gas side piping
B-UNIT
Liquid side piping
Torque wrench
Service Manual 71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents