Switch / Horn - Sym GTS 250 Service Manual

Scooter
Hide thumbs Also See for GTS 250:
Table of Contents

Advertisement

Switch / Horn

Main switch
Inspection
Remove the front cover.
Disconnect the main switch coupler.
Check the continuity between two points as
indicted below
Pin
BAT
Position
LOCK
OFF
ON
Wire Color
Red
Replacement of main switch
Remove main switch cap.
Disconnect the coupler of the main switch and
loosen the mounting bolts (3 bolts).
Remove the main switch.
Install the new main switch and tighten the
mounting bolts.
Install the main switch coupler and cap.
Right handle switch
Remove the handle cover and front cover.
Disconnect the coupler of right handle switch.
Check the continuity between two points as
indicated in the table below
Headlight switch
Pin
TL
Position
¡ ´
Wire Color
Brown Black
Start and engine stop switch
Pin
ST
Position
FREE
Wire Color
Black
To this chapter contents
BAT1
BAT2
Black
Blake
CI
HL
Blue
Black
/White
E
ST
E
Black
Yellow
Sky blue/
/Green
/ Red
Orange
2 blots
1 blot
Headlight switch
CI
Start switch
Right handle switch coupler
17. Electrical System
Main switch coupler
Engine stop switch
17-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lm25w series

Table of Contents