Planning Considerations

Specific Considerations for the 3500yl-PWR Switches

Specific Considerations for the 3500yl-
PWR Switches
The following is an example list of considerations during the planning phase
specific to the 3500yl Switches:
A-4
What if power is lost to the switch?
Power for the switch to operate (system power)
Power for PoE devices
Which devices to plug into which ports and with what priorities?
Port prioritization
Port priority class
Reserve watts
Total watts available (398)
Which bank of 24 ports will be used?
Will load balancing be used?
Will any mini-GBICs be used and in what ports?
Should the 620 RPS/EPS be plugged into a different power source than
the switch it is going to back up.