Planning Considerations
Specific Considerations for the 3500yl-PWR Switches
Specific Considerations for the 3500yl-
PWR Switches
The following is an example list of considerations during the planning phase
specific to the 3500yl Switches:
■
■
■
■
■
■
A-4
What if power is lost to the switch?
•
Power for the switch to operate (system power)
•
Power for PoE devices
Which devices to plug into which ports and with what priorities?
•
Port prioritization
•
Port priority class
•
Reserve watts
•
Total watts available (398)
Which bank of 24 ports will be used?
Will load balancing be used?
Will any mini-GBICs be used and in what ports?
Should the 620 RPS/EPS be plugged into a different power source than
the switch it is going to back up.